NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept" & SG-99-07-009, "Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept." Repts submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c.

Accession Number: ML20210L433

Date Released: Tuesday, August 11, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer