Home > NRC Library > ADAMS Public Documents
Forwards addl info re steam generator tube rupture analysis, per 861112 request,including revised Emergency Operating Procedures E-0 & ES-0.0, "Reactor Trip or Safety Injection" & "Rediagnosis," respectively.
Accession Number: ML20210F193
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210F187 - Forwards addl info re steam generator tube rupture analysis, per 861112 request,including revised Emergency Operating Procedures E-0 & ES-0.0, "Reactor Trip or Safety Injection" & "Rediagnosis," respectively. (18 page(s), 2/4/1987)
- ML20210F219 - Rev 3 to Emergency Operating Procedure E-0, "Reactor Trip or Safety Injection." (3 page(s), 2/4/1987)
- ML20210F224 - Rev 1 to Emergency Operating Procedure ES-0.0, "Rediagnosis." (1 page(s), 2/4/1987)
- ML20210F240 - Rev 3 to Emergency Operating Procedure E-3, "Steam Generator Tube Rupture." (5 page(s), 2/4/1987)