NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Post-Outage (90 day) summary rept for ISI examinations & repair/replacement activities conducted from beginning of first insp period of second ten-yr insp interval through L2R07 refueling outage.

Accession Number: ML20210C157

Date Released: Tuesday, August 11, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer