Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request.Records subj to request available in PDR.
Accession Number: ML20209E304
Date Released: Wednesday, August 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20211D986 - Partial response to FOIA request.Records subj to request available in PDR. (3 page(s), 10/14/1986)
- ML20211E403 - "Rept on Containment Structural Integrity Test for Public Svc Co of New Hampshire,Seabrook Station Unit 1 (SB-1)." (109 page(s), 6/16/1986)
- ML20211E603 - Technical Rept TR-20422(835), "Project QA Plan for Containment Structure,Structural Integrity Test,Public Svc Co of New Hampshire,Seabrook Station Unit 1." (23 page(s), 1/23/1986)
- ML20211E494 - Rev 3 to Technical Procedure TP-13, "Structural Integrity Test (SIT) for Public Svc Co of New Hampshire,Seabrook Station Unit 1." (48 page(s), 6/12/1986)
- ML20211E040 - "Preliminary Review & Evaluation of Seabrook Probabilistic Safety Study." (53 page(s), 1/31/1985)
- ML20209E299 - Summarizes work & findings to date from review of probabilistic safety study in response to J Rosenthal request.No deficiencies found.Review will not be continued. (71 page(s), 4/10/1985)
- ML20211E610 - Technical Rept TR-20422(842), "Seabrook Nuclear Power Station Unit 1 Reactor Bldg Structural Integrity Test Results." App J & K to containment structural integrity test & chronological log encl. (165 page(s), 4/25/1986)
- ML20211E591 - Rev 2 to Technical Rept TR-20422(837), "Installation Procedure for Temporary Frames for Structural Integrity Test of Primary Containment Structure,Public Svc of New Hampshire Seabrook Station - Unit 1." (10 page(s), 3/5/1986)
- ML20211E144 - Forwards draft BNL rept, "Review of Seabrook Station Probabilistic Safety Assessment:Containment Failure Modes & Radiological Source Terms." (68 page(s), 9/13/1985)
- ML20211E574 - Rev 0 to General Test Procedure GT-M-106, "Containment & Containment Encl Surface Insp." Related documentation encl. (57 page(s), 10/14/1986)
- ML20211E458 - Rev 3 to Spec 9763.006-5-5, "Spec for Structural Integrity Test (SIT) for Public Svc Co of New Hampshire,Seabrook Station,Unit 1." (93 page(s), 6/12/1986)
- ML20211E226 - Forwards "Review of Seabrook Station Probabilistic Safety Assessment:Containment Failure Modes & Radiological Source Terms." W/o encl. (1 page(s), 2/21/1986)
- ML20211E331 - Forwards comments re "Seabrook Station Risk Mgt & Emergency Planning Study" & observations & questions re "Seabrook Station Emergency Planning Sensitivity Study." Related documentation encl. (548 page(s), 8/19/1986)
- ML20211E585 - Technical Rept TR-20422(836), "Test Plan for Seabrook Station - Unit 1 Structural Integrity Test." (35 page(s), 3/4/1986)