Partial response to FOIA request.Forwards App M documents. Apps L & M documents available in PDR.
Accession Number: ML20209C072
Date Released: Wednesday, August 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20211D519 - Partial response to FOIA request.Forwards App M documents. Apps L & M documents available in PDR. (9 page(s), 2/12/1987)
- ML20211D640 - Contradicts testimonies of V Tennyson & R Roam re statements by PG&E to QA manager that util had option of complying w/ rules.Suggests that sworn statements be thoroughly investigated. (2 page(s), 4/16/1983)
- ML20211D774 - Notifies of 830421 meeting w/util,NRC & IDVP in Boston,MA to discuss Hosgri response analysis topic & non-Hosgri RLCA verifications. (2 page(s), 4/21/1983)
- ML20211D744 - Notifies of 830517 meeting in San Francisco,CA to discuss development of piping stress intensification factor. (2 page(s), 2/12/1987)
- ML20211E373 - Informs of revised schedule for Commission consideration of IDVP final rept & NRC 830805 SSER re fuel loading at plant. Written comments will be submitted by 830823,Public meetings scheduled for 830913 & 21. (2 page(s), 8/17/1983)
- ML20211E007 - Requests removal & storage of security matls stored in Willste Bldg in Silver Spring,MD.If suitable arrangements not made by 830715,matls will be destroyed. (4 page(s), 6/29/1983)
- ML20211D833 - Discusses proposed change to procedures allowing NRC to attend IDVP-DCP meetings for exchange of background info. (2 page(s), 5/18/1983)
- ML20211E436 - Forwards Revs 0 to interim technical repts,including ITR-57, "Review of Diablo Canyon Plant Activities Fuel Handling Bldg," ITR-58, "Verification of Diablo Canyon Plant Activities Intake Structure" & ITR-60.W/o encls. (1 page(s), 8/25/1983)
- ML20211D946 - Evaluation of Rev 0 to Interim Technical Rept 6, "Interim Technical Rept on Diablo Canyon Unit 1 Independent Verification Program Auxiliary Bldg." NRC agrees that further expansion of rept re seismic model unnecessary. (23 page(s), 6/27/1983)
- ML20211D811 - Notifies of 830512 meeting w/NRC,util & IDVP in Boston,MA to discuss containment & turbine bldgs. (2 page(s), 5/12/1983)
- ML20211E125 - Forwards portion of FR re consideration of issuance of amend License DPR-80 & proposed NSHC determination & opportunity for hearing. (4 page(s), 8/18/1983)
- ML20209C150 - Summarizes results of plant annulus structure horizontal response to Hosgri seismic input analysis discussed w/NRC in Mar 1983.Drawing list,drawings & envelope spectra for each of four floors encl. (9 page(s), 5/17/1983)
- ML20211E515 - Forwards 830819 rev package & 839822 Errata Package 5 to suppl facility IDVP final rept. (1 page(s), 8/24/1983)
- ML20211D868 - Notifies that location of 830602 meeting changed to Boston, MA.Agenda items listed for meeting. (2 page(s), 6/2/1983)
- ML20209C071 - Forwards SER,issued prior to CP issuance,in response to info request re facility const quality & safety qualifications. W/o encl. (2 page(s), 4/1/1983)
- ML20211D597 - Forwards summary of independent development of finite element models & determination of natural frequencies for piping problems in containment spray discharge line & Accumulator Loop 4. (9 page(s), 4/11/1983)
- ML20211D885 - Notifies of 830602 meeting in San Francisco,CA to review requests for info on rupture restraints. (2 page(s), 6/20/1983)
- ML20211E542 - Notifies of change in date & location of 830810 meeting in Waltham,MA re auxiliary bldg & interior structure horizontal spectra.New date & location not indicated. (1 page(s), 8/10/1983)
- ML20211F179 - Notice of SE Turk withdrawal as counsel for NRC in proceeding.All svc lists should be revised. (1 page(s), 2/25/1983)
- ML20211D703 - Notifies of 830209 meeting in San Francisco,CA to discuss shake table tests of electrical equipment. (1 page(s), 2/12/1987)
- ML20211D576 - Staff rept evaluation of Rev 0 to Interim Technical Rept 32, "Interim Technical Rept on Diablo Canyon Unit 1 Independent Verification Program PG&E Pumps." Rept revealed deficiences in PG&E design analyses. (13 page(s), 2/15/1983)
- ML20211E561 - Notifies of IDVP 830805 meeting in Boston,MA re auxiliary bldg & interior structure horizontal spectra. (2 page(s), 8/5/1983)
- ML20211D783 - Notifies of 830426 meeting in San Francisco,CA to discuss status of all structures. (4 page(s), 4/26/1983)
- ML20211D663 - Notifies of 830204 meeting w/util,IDVP,NRC & BNL in San Francisco,CA to discuss status of containment annulus steelwork & status of auxiliary bldg. (1 page(s), 2/12/1987)