Partial response to FOIA request for records re Diablo Canyon.Forwards App J documents.App I & J documents available in PDR.
Accession Number: ML20209B723
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210P155 - Partial response to FOIA request for records re Diablo Canyon.Forwards App J documents.App I & J documents available in PDR. (4 page(s), 2/3/1987)
- ML20210P482 - Rev 0 to "Diablo Canyon Unit 1 IDVP Verification of Design Analysis Hosgri Spectra," Interim Technical Rept 10. (19 page(s), 10/29/1982)
- ML20210P260 - "Interim Technical Rept on Diablo Canyon Unit 1 IDVP,Small Bore Piping,Interim Technical Rept 30,Rev 0." (17 page(s), 9/13/1982)
- ML20210P591 - Forwards open item rept forms issued since last semimonthly rept.Related info encl. (31 page(s), 12/10/1982)
- ML20210P515 - Forwards briefs in support of exceptions filed by Governor Brown & Joint Intervenors in plant proceeding.Comments requested by 821206. (35 page(s), 11/18/1982)
- ML20209B726 - Submits addl info on Model B.Multiple response analysis was carried out for study purposes only,as response not presently acceptable methodology for licensing requirements. Results of study not included. (4 page(s), 9/10/1982)
- ML20210P550 - Provides list of locations where specific deviations from FSAR separation criteria for control panel wiring observed, in response to util 821104 request. (6 page(s), 11/30/1982)
- ML20210P450 - Forwards Rev 0 to "Diablo Canyon Unit 1 IDVP Verification of Design Analysis Hosgri Spectra," Interim Technical Rept 10. (1 page(s), 10/29/1982)
- ML20210P536 - Responds to 821025 request for addl info on plant design verification program.Corrective action discussed in Encl 7 to SECY-82-414 principal reason for NRC determination that design verification effort goes beyond Commission order. (1 page(s), 11/24/1982)
- ML20210P192 - "Interim Technical Rept on Diablo Canyon Unit 1 IDVP, Verification of Design Analysis Hosgri Spectra - Interim Technical Rept 10,Rev 0." (55 page(s), 6/22/1982)
- ML20210P575 - "Interim Technical Rept on Diablo Canyon Unit 1 IDVP:Interim Technical Rept 12,Rev 0,Piping,Interim Technical Rept 17, Rev 0,Piping-Addl Samples." (98 page(s), 12/7/1982)