NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation re util requests for approval of use of increased cumulative usage factor.Pipe breaks need not be postulated in pressurizer surge line & in SI injection lines.Small bore piping should be provided.

Accession Number: ML20207K105

Date Released: Saturday, August 8, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer