Home > NRC Library > ADAMS Public Documents
Forwards "L-Bar Reclamation & Closure Plan," for review & approval.Plan addresses all aspects of permanent reclamation & closure of facility,transferring title of property to State of NM or NRC.W/o plan.App A to plan encl.
Accession Number: ML20207C160
Date Released: Tuesday, October 29, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20207C156 - Forwards "L-Bar Reclamation & Closure Plan," for review & approval.Plan addresses all aspects of permanent reclamation & closure of facility,transferring title of property to State of NM or NRC.W/o plan.App A to plan encl. (1 page(s), 10/6/1986)
- ML20207P172 - App A to "L-Bar U Mine & Mill Reclamation & Closure Plan," consisting of design rept, "Pipe Drain Sys for Stability Enhancement," for tailings dam,L-Bar U Operations,Seboyeta, NM.W/three oversize drawings. (548 page(s), 12/31/1980)
- ML20265C748 - "Proposed Pipe Drain Sys for L-Bar U Operations Tailings Dam." Sheet 1 of 3. (1 page(s), 12/11/1980)
- ML20265C757 - "Plan of Pipe Drain System." Sheet 2 of 3. (1 page(s), 12/8/1980)
- ML20265C759 - "Sections & Details of Pipe Drain System." Sheet 3 of 3. (1 page(s), 12/2/1980)