NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 1 to Ebasco Procedure SAG.CP.19-10/86, "Design Criteria & Procedures for Design Verification of Cable Tray Clamps for Comanche Peak Steam Electric Station Units 1 & 2." Encl provided by Ebasco during 870303 audits.

Accession Number: ML20205E626

Date Released: Thursday, August 6, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer