Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents.Apps S info available in PDR.Forwards App T documents,also in PDR.
Accession Number: ML20204J261
Date Released: Tuesday, October 29, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20205Q260 - Partial response to FOIA request for documents.Apps S info available in PDR.Forwards App T documents,also in PDR. (4 page(s), 10/7/1988)
- ML20205Q441 - Forwards regulatory analysis for proposed reg guide Task EE 006-5, "Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants." (5 page(s), 3/18/1987)
- ML20205Q360 - Forwards draft Commission paper, "Rev of ECCS Rule Contained in App K & 10CFR50.46," for CRGR review. (31 page(s), 6/12/1986)
- ML20207B613 - Forwards proposed Rev 2 to SRP Section 6.5.2, "Containment Spray as Fission Product Clean-up Sys," for consideration by CRGR as Category 2 action. (41 page(s), 12/5/1986)
- ML20205Q428 - Rev 2,Draft 4 to Reg Guide 1.100,Task EE 108-5, "Seismic Qualification of Electrical & Mechanical Equipment for Nuclear Power Plants." (14 page(s), 12/31/1986)
- ML20205Q333 - Draft 3 to Rev 3 to Reg Guide 1.63, "Electric Penetration Assemblies in Containment Structures for Nuclear Power Plant." (5 page(s), 10/31/1985)
- ML20207L210 - Forwards proposed SRP Section 6.5.5, "Pressure Suppression Pools as Fission Product Cleanup Sys," incorporating procedure establishing fission product retention capabilities of BWR pressure suppression pools. (30 page(s), 12/22/1986)
- ML20205Q373 - Forwards Draft 2 of Reg Guide Task EE 404-4, "Qualification of Connection Assemblies for Nuclear Power Plants," for CRGR review. (11 page(s), 10/2/1986)
- ML20205K846 - Forwards draft reg guide,Task OP 713-4, "Criteria for Establishing Bioassay Programs for Tritium," for possible CRGR review.Publication will commence if CRGR response not received within 15 days. (2 page(s), 3/14/1986)
- ML20207B621 - "Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays." (49 page(s), 8/31/1986)
- ML20205E861 - Agrees w/recommended changes re resolution of USI A-43 contained in 850913 minutes of CRGR Meeting 80.Regulatory analysis summary section re work on fracture mechanics augmented.CRGR comments on changes encl. (3 page(s), 10/16/1985)
- ML20204J257 - Forwards,for interim implementation,revised guidance for plant-specific backfit mgt which supersedes NRC Manual Chapter 0514 issued w/Generic Ltr 84-08 on 840420. Implementation effective on 850501. (2 page(s), 4/12/1985)
- ML20207B545 - Advises that proposed CRGR package on proposed new SRP, Section 6.5.5, "Pressure Suppression Pools as Fission Product Cleanup Sys," acceptable. (1 page(s), 11/26/1986)
- ML20205Q410 - Forwards proposed Rev 2,Draft 4 to Reg Guide 1.100, "Seismic Qualification of Electrical & Mechanical Equipment for Nuclear Power Plants," incorporating CRGR comments. (2 page(s), 2/4/1987)
- ML20204J264 - Draft Manual Chapter 0514, "NRC Program for Mgt of Plant- Specific Backfitting of Nuclear Power Plants." (64 page(s), 4/12/1985)
- ML20205Q278 - "Assessment of Value-Impact Associated W/Elimination of Postulated Pipe Ruptures From Design Basis for Nuclear Power Plants." (207 page(s), 3/29/1985)
- ML20207L234 - "Effectiveness of BWR Pressure Suppression Pools in Retaining Fission Products," technical rept. (35 page(s), 8/31/1986)