Home > NRC Library > ADAMS Public Documents
Forwards response to 990317 telcon RAI re BG&E wind tunnel tests & comparison with with ARCON96 computations.Util will await results of NRC review of encl prior to resuming benchmarking of ARCON96 & wind tunnel tests.
Accession Number: ML20204C621
Date Released: Wednesday, August 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20204C618 - Forwards response to 990317 telcon RAI re BG&E wind tunnel tests & comparison with with ARCON96 computations.Util will await results of NRC review of encl prior to resuming benchmarking of ARCON96 & wind tunnel tests. (2 page(s), 3/19/1999)
- ML20204C630 - "Wind Tunnel Modeling of Calvert Cliffs Nuclear Power Plant." Pages C-30,C-31,C-34,C-35,C-114 & C-115 from App C of incoming submittal not included.Pages 8 thru 12,17,23 & 24 from util Sept 85 section not included. (600 page(s), 10/31/1994)
- ML20204C654 - "Review of CCNPP Wind Tunnel Testing." (200 page(s), 11/30/1994)
- ML20204C662 - Rev 0 to "CR X/Q Calculations (based on wind tunnel testing)." (35 page(s), 1/18/1995)
- ML20204D209 - Rev 0 to M94-2, "Control Room X/Q Calculations (based on wind tunnel testing)." (5 page(s), 11/1/1994)