Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for three categories of documents re facility since fuel loading.Forwards App B documents.App A & B documents available in PDR.
Accession Number: ML20202H992
Date Released: Monday, August 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20202H989 - Partial response to FOIA request for three categories of documents re facility since fuel loading.Forwards App B documents.App A & B documents available in PDR. (4 page(s), 7/9/1986)
- ML20202J080 - Forwards final insp rept feeder by EL Meils re feedwater pump turbine failure.Listed areas for evaluation for enforcement action should be included in final write-up. (1 page(s), 2/28/1986)
- ML20202J012 - Lists areas of disagreement from 860124 diesel generator meeting,including lack of visual insp of upper crankshaft main bearing (loaded half) & journal surfaces following planned Diesel Generators 11 & 13 runs. (4 page(s), 2/10/1986)
- ML20202J262 - Discusses Investigation Rept 3-84-021 re allegations on contractor QC supervisor forgery.Related info encl. (326 page(s), 7/3/1985)
- ML20202J004 - Forwards info re diesel generators,per request.License conditions,established in Mar 1985 to forewarn of impending bearing damage,failed to detect recent failures. (4 page(s), 12/11/1985)
- ML20202J031 - Responds to 850823 ltr re 850702 criticality event & forwards insp rept,containing results of review of event & other technical issues.Evaluation of addl investigation results in progress.W/o rept.Related info encl. (30 page(s), 1/9/1986)
- ML20202J125 - Handwritten memo forwarding proposed viewgraph for 860312 Commission briefing entitled, "Summary of Outstanding Technical Issues." (2 page(s), 3/7/1986)
- ML20202J204 - Responds to 850309 ltr re as-built drawing issue.Minor changes,clarification,program refinements & corrective actions in 850308 ltr acceptable. (1 page(s), 3/13/1985)
- ML20202J093 - "Insp Rept,South Reactor Feedwater Pump Turbine Failure." Contract number illegible.Related info encl. (47 page(s), 2/28/1986)
- ML20202J187 - Clarifies agreement reached in 850308 discussion re final 10CFR50.55(e) rept,Item 143.Sequence of steps that implement drawing issue program encl. (3 page(s), 3/9/1985)
- ML20202J052 - Responds to 850813 ltr re Jul 1985 criticality event & forwards insp rept containing review of event & other technical issues.W/o rept.Related info encl. (13 page(s), 1/9/1986)
- ML20202J231 - Ack receipt of Investigation Rept 3-84-019.W/o stated encls. (1 page(s), 8/28/1985)
- ML20202J016 - Delineates various outstanding problems,presents current status & designates responsible organization for outstanding issues re emergency diesel generator failures/reliability. (4 page(s), 3/11/1986)
- ML20202J156 - Responds to 850216 ltr re final 10CFR50.55(e) rept,Item 143, "Deviation of As-Built Plant From Design Documents." Insp efforts will be continued to assure that corrective actions adequately resolve issue. (2 page(s), 3/8/1985)
- ML20202J021 - Forwards description of reactor operations improvement plan, per 850910 meeting re performance corrective actions. (15 page(s), 10/10/1985)
- ML20202H996 - Informs that closure of Action Item Tracking Sys F03048785 cannot be accomplished based on Insp Rept 50-341/85-40 not issued pending receipt of stated repts re 850723 meeting concerning 850701 criticality event. (1 page(s), 12/5/1985)