NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards SSER 3,which provides staff evalation of GIP,rev 3 to seismic verification of NPP equiopment,update on 970516. Changes in anchorage criteria as updated in GIP,rev 3 acceptable.

Accession Number: ML20202F947

Date Released: Tuesday, October 29, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer