NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Perry Nuclear Power Plant Control Room Validation Summary Rept," per Section 2.7 of Suppl 1 to DCRDR.Submittal re control room review process,required prior to issuance of full power OL,completed.

Accession Number: ML20202F335

Date Released: Monday, August 3, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer