Home > NRC Library > ADAMS Public Documents
Submits info in order to permit staff to continue review of util response to GL 96-06,dtd 970128,in response to RAI. Rev 0 to GGNS-97-0002, "GL 96-06 Evaluation of Drywell & Containment Penetrations," encl.W/26 oversize drawings.
Accession Number: ML20199G490
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20199G486 - Submits info in order to permit staff to continue review of util response to GL 96-06,dtd 970128,in response to RAI. Rev 0 to GGNS-97-0002, "GL 96-06 Evaluation of Drywell & Containment Penetrations," encl.W/26 oversize drawings. (3 page(s), 11/20/1997)
- ML20199G719 - Rev 0 to "Grand Gulf Nuclear Station Engineering Rept GGNS-97-0002 for GL 96-06 Evaluation of Drywall & Containment Penetrations." (53 page(s), 1/28/1997)
- ML20266C571 - UNIT 1 CONTAINMENT CYLINDER WALL PENET SCHEDULE RADIATION SHIELDING DETAILS. (1 page(s), 11/5/1981)
- ML20266C574 - UNIT 1 CONTAINMENT CYLINDER WALL PENTE SCHEDULE & RADIATION SHIELDING DETAILS.Sheet 1 of 1. (1 page(s), 3/27/1991)
- ML20266C582 - UNIT 1 CONTAINMENT DRYWELL WALL PENET SLEEVE SCHEDULE & DETAILS. (1 page(s), 11/20/1997)
- ML20266C586 - UNIT 1 CONTAINMENT DRYWELL WALL PENETRATIONS SCHEDULE & SHIELDING DETAILS. (1 page(s), 3/21/1985)
- ML20266C592 - SYSTEM PIPING ISOMETRIC COMP COOL WATER SUPPLY RETURN AUX BLDG ABOVE EL 93 0 UNIT 1. (1 page(s), 11/20/1997)
- ML20266C597 - SYSTEM PIPING ISOMETRIC COMPONENT COOLING WATER SUPPLY & RETURN CTMT EL 135 4 UNIT 1. (1 page(s), 5/21/1980)
- ML20266C616 - SYSTEM PIPING ISOMETRIC PLAN SERVICE WTR IN CTMT AREA II UNIT 1. (1 page(s), 1/16/1982)
- ML20266C621 - SYSTEM PIPING ISOMETRIC PLANT SERVICE WTR IN CTMT AREA II UNIT 1. (1 page(s), 7/28/1985)
- ML20266C626 - SYSTEM PIPING ISOMETRIC CONDENSATE TRANSFER SYSTEM CTMT UNIT 1. (1 page(s), 11/20/1997)
- ML20266C630 - SYSTEM PIPING ISOMETRIC FLOOR & EQUIP DR EQUIP DR SUMP PR DISCH AUX BLDG & CTMT UNIT 1. (1 page(s), 11/20/1997)
- ML20266C636 - SYSTEM PIPING ISOMETRIC FL & EQUIP DR FL DR SUMP PP DISCH AUX BLDG & CTMT UNIT 1. (1 page(s), 11/20/1997)
- ML20266C640 - HCB 20 DRYWELL CHEMICAL WASTE FROM HCD-33 TO HCD-34. (1 page(s), 10/23/1981)
- ML20266C646 - SYSTEM PIPING ISOMETRIC CHILLED WATER SYSTEM AUX BLDG & CTMT EL 119 0 UNIT 1. (1 page(s), 11/20/1997)
- ML20266C649 - SYSTEM PIPING ISOMETRIC PLANT CHILLED WATER CTMT UNIT 1. (1 page(s), 11/20/1997)
- ML20266C653 - SYSTEM PIPING ISOMETRIC RWCU BLOWDOWN TO CONDENSER UNIT 1. (1 page(s), 11/20/1997)
- ML20266C659 - SAMPLE LINE FROM REACTOR WATER TEST CONN TO POST ACCIDENT SAMPLING. (1 page(s), 2/25/1982)
- ML20266C665 - SYSTEM PIPING ISOMETRIC FPC & CU REFUEL WTR TO AND FROM REACT WELL AUX BLDG & CTMT UNIT 1. (1 page(s), 11/20/1997)
- ML20266C670 - SYSTEM PIPING ISOMETRIC FPC & CU CTMT POOLS TO AUX BLDG CONTAINMENT UNIT 1. (1 page(s), 4/18/1983)
- ML20266C675 - SAMPLE LINE FROM JET PUMP INSTRUMENTATION TO POST ACCIDENT SAMPLING. (1 page(s), 2/25/1982)
- ML20266C680 - SYSTEM PIPING ISOMETRIC FL & EQUIP DR CHEM WASTE SUMP PUMP DISCH CTMT & AUX BLDG UNIT 1. (1 page(s), 11/20/1997)
- ML20266C684 - JCD 71 JCD 36 & HBB 155 MAKEUP WATER HEADER FOR CONTAINMENT. (1 page(s), 8/24/1987)
- ML20266C690 - JCD 11 JCD 33 JCD 71 HBB 155 MAKEUP WATER HEADER IN CONTAINMENT FROM HBB 155. (1 page(s), 8/24/1981)