Home > NRC Library > ADAMS Public Documents
Forwards final, "Remedial Action Plan," for Mexican Hat,UT. In order to support review of RAP & RAP mod,listed repts also encl.
Accession Number: ML20198K693
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20198M977 - Forwards final, "Remedial Action Plan," for Mexican Hat,UT. In order to support review of RAP & RAP mod,listed repts also encl. (1/20/1989)
- ML20198K647 - UMTRAP Mexican Hat,UT Monument Valley,AZ, "Info for Bidders," Vols I,II & III. (6/30/1988)
- ML20198K714 - Final, "Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Mexican Hat,UT," Text Apps A,B,C & D. (7/31/1988)
- ML20198K775 - UMTRAP Mexican Hat,UT HAT-PH-II, "Calculations,Final Design for Signature," Vols I,II,III & IV. (6/30/1988)
- ML20198L712 - UMTRAP Mexican Hat,UT Monument Valley,AZ, "Calculations, Final Design for Review." (9/30/1988)
- ML20198L730 - UMTRAP Monument Valley,AZ MON, "Subcontract Documents,Final Design for Bidding;Bid Schedule,Special Conditions, Specifications & Subcontract Drawings." (9/30/1988)
- ML20198L742 - Final, "Mod to Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site at Mexican Hat,UT," Vol I-Text,Attachments 1-6 & Vol II,App F Specifications & Drawings. (1/31/1989)