Home > NRC Library > ADAMS Public Documents
Notification of contract execution,Mod 1,Task Order 11, "ADP Planning,Requirements Analysis & Preliminary Design Studies." Contractor:Applied Mgt Sys,Inc.
Accession Number: ML20197H688
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20197H683 - Notification of contract execution,Mod 1,Task Order 11, "ADP Planning,Requirements Analysis & Preliminary Design Studies." Contractor:Applied Mgt Sys,Inc. (1 page(s), 11/14/1990)
- ML20197H751 - Mod 1 to Task Order 11,revising period of performance at no addl cost or obligation,of "ADP Planning,Requirements Analyses & Preliminary Design Studies." (1 page(s), 11/9/1990)