Home > NRC Library > ADAMS Public Documents
Forwards LERs 84-038-00,85-040-00 & 86-002-01 re incomplete performance of surveillance tests.Surveillance program improvement action plan & status discussed w/Region V mgt on 860425.
Accession Number: ML20197G119
Date Released: Wednesday, July 29, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20197G113 - Forwards LERs 84-038-00,85-040-00 & 86-002-01 re incomplete performance of surveillance tests.Surveillance program improvement action plan & status discussed w/Region V mgt on 860425. (3 page(s), 5/9/1986)
- ML20197G158 - LER 84-038-00:on 860415,during surveillance test review, discovered that on 841015,interval for performing valve stroke timing test of 10% atmospheric dump valves exceeded. Caused by procedural deficiency.Test completed on 850106. (5 page(s), 5/9/1986)
- ML20197G194 - LER 85-040-00:on 860411,during surveillance test review, discovered that on 850521,interval for performing test start of diesel generator 1-1 exceeded.Caused by operator misinterpretation.Test completed on 850603. (6 page(s), 5/9/1986)
- ML20197G227 - LER 86-002-01:on 860204,during routine shift check review, discovered that on 860201,time limit for performing Surveillance Test Procedure R-2B, "Operator Heat Balance," exceeded.Caused by personnel error.Test completed on 860201. (5 page(s), 5/9/1986)