Home > NRC Library > ADAMS Public Documents
Final response to FOIA request.Forwards App A & B documents. App B documents also available in PDR.
Accession Number: ML20197F583
Date Released: Sunday, August 16, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20215D900 - Final response to FOIA request.Forwards App A & B documents. App B documents also available in PDR. (3 page(s), 10/6/1986)
- ML20197F676 - Summary of 811109-10 site visit to review physical model of backwater & surrounding coastal areas. (2 page(s), 11/17/1981)
- ML20197F901 - Forwards input for use in preparing Suppl 16 to SER on effect of breakwater damage on saltwater intake structure. Issue resolved satisfactorily. (2 page(s), 2/15/1983)
- ML20197F605 - Advises that facility breakwater structure has been found acceptable for low power operation.M Fliegel 810729 trip rept encl. (1 page(s), 7/14/1981)
- ML20197F598 - Requests speedy resolution of breakwater problem solving & status rept. (1 page(s), 7/14/1981)
- ML20197F595 - Submits tentative schedule for breakwater problem solving & status rept.Marked-up H Denton 810714 memo to Eisenhut encl. (2 page(s), 7/31/1981)
- ML20215D909 - SSER re effect of breakwater damage on saltwater intake structure. (10 page(s), 2/15/1983)
- ML20197F580 - Submits status of evaluation by Coastal Engineering Research Ctr re facility intake structure flooding - breakwater damage. (2 page(s), 7/29/1981)
- ML20197F645 - Notification of 810925 meeting w/util in Bethesda,MD to discuss resolution of breakwater structure. (1 page(s), 9/23/1981)
- ML20197F813 - Forwards agenda & list of attendees for 820729 informal meeting w/applicant re status of studies on vent mods to svc water intake compartment,wave & ship collision impact forces & repairs to breakwaters. (3 page(s), 8/5/1982)
- ML20197F712 - Advises that since applicant has not submitted info re status of breakwater/intake problem,SER suppl input will be delayed until mid-May. (1 page(s), 1/12/1982)
- ML20197F665 - Summary of 810925 meeting w/util re various approaches available to resolve UHS intake structure flood protection concerns. (2 page(s), 10/14/1981)