Final response to FOIA requests for records re evaluation of ISAPs for plant.App E documents in PDR.App F,G & H documents encl & in PDR.App I & J documents withheld (ref FOIA Exemption 5).
Accession Number: ML20197E251
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20215B696 - Final response to FOIA requests for records re evaluation of ISAPs for plant.App E documents in PDR.App F,G & H documents encl & in PDR.App I & J documents withheld (ref FOIA Exemption 5). (25 page(s), 10/3/1986)
- ML20266H095 - Voided "BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram." ACTUAL REV STATUS:CP-6 (1 page(s), 4/6/1985)
- ML20215B827 - Rev 0 to Quality Instruction QI-049, "Reinsp of Large Bore Pipe - Welds/Matl." Related info encl. (200 page(s), 10/14/1985)
- ML20266H193 - "Termination Rack CPO-ECPRTC-17 Interconnection Diagram." ACTUAL REV STATUS:CP-4. (1 page(s), 7/11/1983)
- ML20215B742 - Rev 1 to Comanche Peak Response Team Results Rept ISAP I.a.4, "Agreement Between Drawings & Field Terminations." (16 page(s), 3/13/1986)
- ML20215B876 - Discusses 851113-14 audit of Comanche Peak Response Team const evaluation program in area re piping & pipe supports. Three unresolved items listed. (55 page(s), 12/11/1985)
- ML20215B728 - Rev 4 to Issue Specific Action Plan ISAP I.a.4, "Agreement Between Drawings & Field Terminations." (9 page(s), 1/24/1986)
- ML20215B741 - Rev 1 to Comanche Peak Response Team Results Rept ISAP II.b, "Concrete Compression Strength." (32 page(s), 2/28/1986)
- ML20215B745 - Rev 1 to Comanche Peak Response Team Results Rept ISAP VII.b.2, "Valve Disassembly." (21 page(s), 3/20/1986)
- ML20198G456 - Provides list of NRR/IE staff audits/insps recorded for Oct, Nov & Dec 1985,for which trip repts must be written. (4 page(s), 11/26/1985)
- ML20215B808 - Forwards CASE first analysis of implementation of Results Rept I.a.4, "Agreement Between Cable Terminations & Current Design Drawings." Analysis not technical.Requests response to identified deficiencies.Related info encl. (652 page(s), 5/5/1986)
- ML20197E254 - Forwards Comanche Peak Review Team presentation on mechanical open issue status,based on 851204 audit of mechanical/piping areas in SSER 10. (615 page(s), 2/6/1986)
- ML20215B736 - Rev 4 to Issue Specific Action Plan ISAP III.d, "Preoperational Testing." (12 page(s), 2/27/1986)
- ML20215B725 - Rev 1 to Issue Specific Action Plan ISAP VII.b.2, "Valve Disassembly." (8 page(s), 1/24/1986)
- ML20197E289 - Discusses Energy Technology Engineering Ctr review of Rev 3 to Comanche Peak Review Team Issue-Specific Action Plan V.d re unauthorized "plug welds" in ASME pipe supports & base plates & in cable tray supports.Review encl. (6 page(s), 4/8/1986)
- ML20266H108 - "BOP Aux Relay Rack 2 CPI-ECPRCR-04 External Connection Diagram." ACTUAL REV STATUS:CP-7 (1 page(s), 7/26/1985)
- ML20215B749 - Rev 1 to Comanche Peak Response Team Results Rept ISAP I.b.3, "Conduit to Cable Tray Separation." (14 page(s), 3/26/1986)
- ML20197E245 - Trip rept of 851125 visit to S&W Engineering Corp re audit of nonseismic piping effects on seismic design piping. Further audit of anchor designs required.List of attendees & related info encl. (19 page(s), 12/18/1985)
- ML20215B805 - Responds to request for status of funding on FIN A-3803, "Evaluation of Selected NRC Open Items Before Plant Fuel Load,Project 1:SSER Development for Comanche Peak." Items that BNL providing assistance for listed. (3 page(s), 4/9/1986)
- ML20215B713 - Rev 4 to Issue Specific Action Plan ISAP I.b.3, "Conduit to Cable Tray Separation." (7 page(s), 1/24/1986)
- ML20215B734 - Rev 3 to Issue Specific Action Plan ISAP II.b, "Concrete Compression Strength." (12 page(s), 1/24/1986)
- ML20266H159 - "Solid State System Train A Output Cabinet 2 Interconnection Diagram." ACTUAL REV STATUS:CP-1 (1 page(s), 7/8/1985)
- ML20198A376 - Forwards,for review,documentation of applicant proposed Project Procedure CPP-022, "Supplemental Evaluation of Visual Welding Insp Techniques." Comments & SSER requested by 851125. (1 page(s), 10/30/1985)
- ML20215B816 - Submits update of 860408 schedule for remaining work needed on SSER 13 for Comanche Peak Program Plan.Related info encl. (320 page(s), 4/9/1986)
- ML20210K577 - Provides procedures for review of Comanche Peak Review Team result repts expected to be submitted through Oct/Nov 1986.Related info encl. (155 page(s), 4/21/1986)
- ML20215B798 - Submits outline of remaining work needed on SSER 13 & persons responsible,per 860402 meeting. (2 page(s), 4/3/1986)
- ML20266H176 - "Main Control Board CPI-ECPRCB-03 Interconnection Diagram." ACTUAL REV STATUS:CP-6 (1 page(s), 7/23/1985)
- ML20215B835 - Summarizes NRC 860214 audit meeting w/util & Ebasco in New York City,NY re Comanche Peak conduit & conduit support programs.List of attendees encl.Highlights of presentations listed. (24 page(s), 4/10/1986)
- ML20210A924 - Responds to 850930 request for listed IE actions to confirm adequacy of QA program.Present QA program does not comply w/NRC QA guidance in 18 areas.Summary of actions re program adequacy & viewgraphs encl. (11 page(s), 1/15/1986)
- ML20266H183 - "Solid State Protection System Train B Output Cabinet Number 1 Interconnection Diagram." ACTUAL REV STATUS:CP-4. (1 page(s), 7/18/1986)
- ML20266H113 - "Termination Rack CPI-ECPRTC-41 Interconnection Diagram." Rev date illegible. ACTUAL REV STATUS:CP-4. (1 page(s), 10/3/1986)
- ML20266H170 - "Termination Rack CPI-ECPRTC-42 Interconnection Diagram." Rev date illegible. ACTUAL REV STATUS:CP-3. (1 page(s), 10/3/1986)
- ML20266H148 - "Solid State Safeguards Sequencer Cabinet A Interconnection Diagram Tag CPI-ECPRCCR-01." ACTUAL REV STATUS:CP-3 (1 page(s), 4/25/1985)