Home > NRC Library > ADAMS Public Documents
Forwards phase II subcontract documents - final design dtd Nov 1986,calculations - Vols 1,II,III.IV & V dtd Nov 1986, phase II Const drawings,final remedial action plan - Vol I II & III,dtd Oct 1986 & attachment 1,for review & comments.
Accession Number: ML20197E159
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20197E153 - Forwards phase II subcontract documents - final design dtd Nov 1986,calculations - Vols 1,II,III.IV & V dtd Nov 1986, phase II Const drawings,final remedial action plan - Vol I II & III,dtd Oct 1986 & attachment 1,for review & comments. (3 page(s), 11/19/1986)
- ML20197E178 - Uranium Mill Tailings Remedial Action Project,Tuba City,AZ, Tub-Ph-II subcontract documents, "Final Design for Review," including bid schedule,specific conditions,specifications & subcontract drawings. (188 page(s), 11/30/1986)
- ML20197E204 - Uranium mill tailings remedial action project,Tuba City,AZ, "Calculations," Vols 1-V. (1600 page(s), 11/30/1986)
- ML20197E278 - "Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site At Tuba City,AZ,Text,Apps A,B, C & D." W/two oversize drawings. (352 page(s), 10/31/1986)