Home > Site Help > Search Results
Byron Station, Units 1 and 2, Application for Revision to TS 5.5.9, "Steam Generator (SG) Program," for a One-Time Deferral of Steam Generator Tube Inspections
Accession Number: ML20196L732
Date Released: Tuesday, July 21, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195B158 - Byron Station, Units 1 and 2, Application for Revision to TS 5.5.9, "Steam Generator (SG) Program," for a One-Time Deferral of Steam Generator Tube Inspections. (12 page(s), 7/10/2020)
- ML20195B159 - Attachment 1 - Description and Assessment. (36 page(s), 7/10/2020)
- ML20195B161 - Attachment 6 - Intertek Report No. AIM 200510800-2Q-1(NP), "Byron Unit 2 Operational Assessment Addressing Deferment of B2R22 Steam Generator Tube Examinations to B2R23, April 2022." (90 page(s), 6/25/2020)
- ML20195B162 - Attachment 11 - SG-SGMP-17-25-NP, Revision 1, "Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020." (64 page(s), 6/30/2020)