NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards groundwater detection monitoring plan.Plan modified to include listed responses to NRC 880408 comments. Background wells,point of compliance wells,statistical analysis & Criterion 13 hazardous constituents addressed.

Accession Number: ML20195K402

Date Released: Monday, October 28, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer