Further response to FOIA request for records re NRC Comanche Peak Task Force established in Mar 1984.App S Documents 1-27 encl & available in PDR.
Accession Number: ML20195F283
Date Released: Monday, July 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195F277 - Further response to FOIA request for records re NRC Comanche Peak Task Force established in Mar 1984.App S Documents 1-27 encl & available in PDR. (14 page(s), 5/12/1986)
- ML20195F308 - Suppl II, "Base Plates Installation Guidelines," to Rev 0 to CP-CPM 6.9F. (2 page(s), 2/6/1980)
- ML20195F443 - Rev 17 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (73 page(s), 2/2/1983)
- ML20195F399 - Voided Rev 12 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (9 page(s), 12/28/1981)
- ML20195F376 - Rev 6 to Procedure QI-QAP-11.1-28, "Installation Insps of ASME Component Supports,Class 1-3." (26 page(s), 2/19/1981)
- ML20195F511 - Rev 10 to Procedure CP-CPM 6.3, "Preparation,Approval & Control of Operation Travelers." (15 page(s), 9/22/1983)
- ML20195F295 - Rev 1 to Plant Mfg Instruction 3.1.1, "Thread Upset." Related info encl. (376 page(s), 9/29/1980)
- ML20195F302 - Voided Rev 9 to Const Procedure 35-1195-DCP-3, "Document Control Reproduction Process." (21 page(s), 2/19/1979)
- ML20195F436 - Voided Rev 15 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (17 page(s), 1/17/1983)
- ML20195F636 - Rev 10 to Procedure QI-QP-11.10-5, "Cable Tray Hanger Reinsp." (6 page(s), 6/19/1984)
- ML20195F542 - Voided Rev 23 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (66 page(s), 10/24/1983)
- ML20195F478 - Voided Rev 3 to Procedure QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (42 page(s), 6/29/1983)
- ML20195F466 - Rev 20 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (64 page(s), 5/16/1983)
- ML20195F560 - Rev 2 to Procedure CP-CPM 14.1, "Guidelines for Protection of Permanent Plant Equipment." (4 page(s), 3/5/1984)
- ML20195F630 - Rev 25 to Procedure QI-QAP-11.1-28, "Fabrication & Installation Insp of Safety Class Component Supports." (75 page(s), 6/11/1984)
- ML20195F343 - Voided Rev 10 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (12 page(s), 8/6/1980)
- ML20195F391 - Rev 7 to Procedure QI-QAP-11.1-28, "Installation Insps of ASME Component Supports,Class 1-3." (40 page(s), 5/28/1981)
- ML20195F356 - Voided Rev 0 to Procedure QI-QAP-11.1-28, "Installation of Insps of ASME Component Supports,Class 1-3." (3 page(s), 9/8/1980)
- ML20195F411 - Rev 8 to Procedure QI-QAP-11.1-28, "Installation Insps of ASME Component Supports,Class 1-3." (7 page(s), 1/15/1982)
- ML20195F563 - Voided Rev 17 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (10 page(s), 3/16/1984)
- ML20195F423 - Voided Rev 0 to Procedure QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (32 page(s), 10/29/1982)
- ML20195F383 - Voided Rev 11 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (13 page(s), 3/9/1981)
- ML20195F483 - Voided Rev 21 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (65 page(s), 6/29/1983)
- ML20195F326 - Temporary Change Notice 1 to Rev 0 to 35-1195-CPM 6.9F. Incomplete Temporary Change Notices 2,3 & 4 encl. (12 page(s), 3/27/1980)
- ML20195F368 - Rev 5 to Procedure QI-QAP-11.1-28, "Installation Insps of ASME Component Supports,Class 1-3." (26 page(s), 1/7/1981)
- ML20195F691 - Rev 1 to Procedure QI-QP-11.10-1A, "Insp of Class 1E Conduit Raceway Sys." (36 page(s), 9/21/1984)
- ML20195F641 - Rev 1 to Procedure CP-EI-4.0-54, "Engineering Instruction for Pipe Hanger Engineering Data Rept." (3 page(s), 7/5/1984)
- ML20195F331 - Suppl 1, "Dimensional Tolerances for Fabrication/ Installation of Component Supports," to Rev 0 to CP-CPM 6.9F. (7 page(s), 2/6/1980)
- ML20195F572 - Voided Rev 24 to Procedure QI-QAP-11.1-28, "Fabrication & Installation Insp of Safety Class Component Supports." Related info encl. (106 page(s), 4/18/1984)
- ML20195F430 - Rev 16 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (56 page(s), 12/15/1982)
- ML20195F554 - Rev 9 to Procedure CP-EI-4.0-13, "Control of Stress Analysis for Pipe Support Engineering." (6 page(s), 10/27/1983)
- ML20195F655 - Rev 29 to Procedure QI-QP-11.10-1, "Insp of Seismic Electrical Support & Restraint Sys." (59 page(s), 8/24/1984)
- ML20195F453 - Rev 19 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (64 page(s), 4/12/1983)
- ML20195F318 - Suppl IV, "Maint & Installation Manual:ITT Grinnell Figure 306 & Figure 307 Mechanical Shock & Sway Suppressor," to Rev 0 to CP-CPM 6.9F.Related info encl. (36 page(s), 2/6/1980)
- ML20195F613 - Rev 7 to Procedure CP-CPM-6.9E, "Pipe Fabrication & Installation." (48 page(s), 5/14/1984)
- ML20195F526 - Rev 7 to Instruction CP-EI-4.5-4, "Technical Svcs Engineering Instruction for Pipe Hanger Design Review & Certification." (4 page(s), 10/11/1983)
- ML20195F406 - Voided Rev 13 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (23 page(s), 1/15/1982)
- ML20195F647 - Rev 6 to Procedure CP-CPM-6.9G, "Documentation for ASME Welding,Fabrication & Installation Activities." (45 page(s), 7/9/1984)
- ML20195F585 - Voided Rev 1 to Procedure QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (41 page(s), 2/2/1983)
- ML20195F350 - Rev 0 to Procedure CP-CPM-9.10, "Fabrication & Installation of ASME-Related Component Supports." (18 page(s), 9/3/1980)
- ML20195F675 - Rev 2 to Procedure CP-CPM 6.9C, "Matl Identification." (11 page(s), 9/18/1984)
- ML20195F501 - Voided Rev 22 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (66 page(s), 8/4/1983)
- ML20195F603 - Voided Rev 4 to QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (44 page(s), 8/4/1983)
- ML20195F662 - Rev 8 to Procedure ECP-10, "Cable Tray & Hangers Installation." (32 page(s), 8/31/1984)
- ML20195F699 - Rev 2 to Procedure CP-CPM-6.9B, "Weld Filler Matl Control." Related info encl. (32 page(s), 9/20/1984)
- ML20195F459 - Voided Rev 2 to Procedure QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (42 page(s), 4/28/1983)
- ML20195F686 - Rev 14 to Procedure QI-QP-11.14-4, "Control of Matl Traceability for Site Fabricated Structural/Miscellaneous Steel." (5 page(s), 9/21/1984)
- ML20195F518 - Rev 11 to Welding Procedure Spec WPS-11032, "Shielded Metal Arc." (24 page(s), 9/29/1983)
- ML20195F337 - Rev 0 to Procedure CP-CPM 6.9H, "Cleanliness Control." (21 page(s), 2/6/1980)
- ML20195F668 - Rev 28 to Procedure QI-QP-11.10-2, "Cable Tray Hanger Insp." (17 page(s), 9/11/1984)
- ML20195F593 - Rev 18 to Procedure QI-QAP-11.1-28, "Fabrication, Installation Insps of ASME Component Supports,Class 1-3." (64 page(s), 3/31/1983)
- ML20195F418 - Voided Rev 14 to Procedure DCP-3, "Comanche Peak Steam Electric Station Document Control Program." (11 page(s), 8/18/1982)
- ML20195F534 - Voided Rev 5 to Procedure QI-QAP-11.1-28A, "Installation Insps of ASME Class 1-3 Snubbers." (46 page(s), 11/8/1983)
- ML20195F495 - Rev 2 to Procedure CP-CPM 10.2, "Cleaning & Insulating Stainless Steel Pipe & Equipment." (5 page(s), 7/12/1983)
- ML20195F623 - Rev 21 to Procedure CP-QAP-16.1, "Control of Nonconforming Items." (37 page(s), 6/11/1984)
- ML20195F285 - Rev 0 to Maint & Insp Procedure MI 3, "Procedure for Confirming Full Thread Engagement Via Eye Rod Measurement for Rigid Sway Struts." Related info encl. (36 page(s), 9/30/1980)
- ML20195F313 - Suppl III, "Instruction Manual:Installation & Maint Mechanical Shock Arrestors,Models PSA-1/4,PSA-1/2,PSA-1, PSA-3,PSA-10,PSA-35,PSA-100," to Rev 0 to CP-CPM 6.9F. (25 page(s), 2/6/1980)