NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Suppl 3 to "Preliminary Design Assessment of Braidwood-1 Generating Station Control Room Human Factors Engineering Review," per SER Section 18.Environ survey will be completed prior to criticality.

Accession Number: ML20195E520

Date Released: Monday, July 27, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer