Further response to FOIA request for records re NRC Comanche Peak Task Force in category of test programs.Documents listed in App N encl & available in PDR.Review continuing.
Accession Number: ML20195D806
Date Released: Monday, July 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195D802 - Further response to FOIA request for records re NRC Comanche Peak Task Force in category of test programs.Documents listed in App N encl & available in PDR.Review continuing. (32 page(s), 5/30/1986)
- ML20195D894 - Forwards preoperational containment integrated leak rate test rept,per 10CFR-50,App J.Rept incomplete pending resolution of open item.Supplementary rept will be submitted by 830701.Related info encl. (317 page(s), 4/22/1983)
- ML20195D938 - Rev 2 to Nuclear Operations Support Manual Instruction NOS-103-1, "Guidance for Assessment & Distribution of Industry Operating Experience Repts." (350 page(s), 2/15/1984)
- ML20195D851 - Rev 3 to Prerequisite Test Instruction XCP-EE-14, "Molded Case Circuit Breaker & Thermal Overload Relay/Heater Testing." Related documentation encl. (55 page(s), 4/23/1980)
- ML20195D924 - Rev 5 to Procedure CP-QP-19.6, "Surveillance of Const & Startup/Turnover Activities." (3 page(s), 5/15/1984)
- ML20195D929 - Rev 0 to Instruction QI-QP-19.6-1, "Surveillance Deficiency Repts." (5 page(s), 5/14/1984)
- ML20195D868 - "Reactor Containment Bldg Unit 1 Preoperational Integrated Leak Rate Test." Related info encl. (990 page(s), 12/31/1983)
- ML20195D918 - Rev 6 to Procedure CP-QP-19.6, "Surveillance of Const & Startup/Turnover Activities." (3 page(s), 6/20/1984)
- ML20195D809 - Rev 0 to Test Procedure 1CP-PT-02-12, "Bus Voltage & Load Survey." Related documentation encl. (306 page(s), 7/15/1985)