NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14." Replacement of SGs planned for next refueling outage (2R14) scheduled for fall of 2000.

Accession Number: ML20195D181

Date Released: Monday, July 27, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer