Home > NRC Library > ADAMS Public Documents
Second partial response to FOIA request for documents.App B documents encl & available in PDR.
Accession Number: ML20195C961
Date Released: Monday, July 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195C957 - Second partial response to FOIA request for documents.App B documents encl & available in PDR. (2 page(s), 6/15/1988)
- ML20195D082 - Insp Rept 50-275/70-01 on 700416-17.No noncompliance noted. Major areas inspected:review of primary loop spool piece fabrication. (12 page(s), 5/26/1970)
- ML20195D405 - Forwards draft rept of insp on 710412-14.Major areas inspected:requirements of PI3800/2,Attachment H & I,Sections 5105.03,04 & 5205.03,04 re present cont activity. (15 page(s), 4/28/1971)
- ML20195D322 - Forwards 700917-18 feeder insp rept. (1 page(s), 10/13/1970)
- ML20195D272 - Informs of 700915-16 insp at plant.QC & nondestructive testing of liquid holdup tank failed to meet licensee commitments.Welding procedures & welder qualifications for two welders met requirement Section IX of ASME Code. (1 page(s), 10/9/1970)
- ML20195C972 - Forwards Insp Rept 50-275/70-01 on 700416-17.No nonconformance noted. (13 page(s), 6/3/1970)