Forwards 880616 ltr from WG Counsil to NH Williams transmitting info requested by CYGNA,including Ebasco Procedures SAG.CP17,SAG.CP10 & CCP 45.
Accession Number: ML20195C398
Date Released: Monday, July 27, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20195C393 - Forwards 880616 ltr from WG Counsil to NH Williams transmitting info requested by CYGNA,including Ebasco Procedures SAG.CP17,SAG.CP10 & CCP 45. (55 page(s), 6/16/1988)
- ML20195C409 - Rev 7 to, "Design Criteria for Junction Boxes Seismic Category I Electrical Conduit Sys," third party record copy. (32 page(s), 10/12/1987)
- ML20195C459 - Rev 7 to "Design Criteria for Seismic Category I Electrical Conduit Sys." (38 page(s), 12/31/1987)
- ML20195C504 - Rev 3 to CCP 45, "Permanent & Temporary Attachments to Embedded Weld Plates." (17 page(s), 10/11/1984)
- ML20195C547 - Rev 1 to, "Bldg & Secondary Wall Displacements." (81 page(s), 3/18/1987)
- ML20195C602 - Rev 1 to, "Procedure for Conduit Isometric Design Validation Package Closeout." (35 page(s), 11/20/1987)
- ML20195C659 - Rev 4 to, "General Instructions for Design Verification of Electrical Conduit & Box Supports." (197 page(s), 10/12/1987)
- ML20195C693 - Rev 1 to, "Technical Guidelines for Seismic Category I Electrical Conduit Isometic Validation." (141 page(s), 10/16/1987)
- ML20195C735 - Rev 4 to, "Technical Guidelines for Sys Analysis of Conduit Span Configurations." (60 page(s), 10/13/1987)
- ML20195C750 - Rev 3 to, "Technical Guidelines for Thermal Analysis of Seismic Category I Electrical Conduit Sys." (38 page(s), 10/13/1987)