Home > NRC Library > ADAMS Public Documents
Millstone Power Station, Unit No. 2 - May 26, 2020, Pre-Submittal Meeting Re: Proposed Alternative Relief for Steam Generator Weld Examinations (EPID L-2020-LRM-0040)
Accession Number: ML20176A601
Date Released: Friday, August 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20135H019 - 05/26/2020 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. on a Proposed Alternative Request for Millstone Power Station, Unit No. 2, Regarding Extension of Examination Interval for Steam Generator Welds (3 page(s), 5/14/2020)
- ML20143A077 - Millstone Power Station, Unit 2 - Presentation Material for 5/26/20 Pre-Submittal Meeting re: Steam Generator Examination Frequency Alternative Request (EPID L-2020-LRM-0040). (9 page(s), 5/26/2020)
- ML20176A599 - Millstone Power Station, Unit No. 2 - Summary of May 26, 2020, Pre-Submittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. Re: Proposed Alternative Request for Steam Generator Weld Examinations (EPID L-2020-LRM-0040) (5 page(s), 6/29/2020)