Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report
Accession Number: ML20160A057
Date Released: Wednesday, December 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20160A058 - Beaver Valley Power Station, Unit 1, Submittal of the Updated Final Safety Analysis Report, Revision 32. (5 page(s), 5/20/2020)
- ML20160A059 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Summary List of Effective Pages. (49 page(s), 5/20/2020)
- ML20160A060 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary. (188 page(s), 5/20/2020)
- ML20160A062 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 3, Reactor. (273 page(s), 5/20/2020)
- ML20160A063 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System. (138 page(s), 5/20/2020)
- ML20160A064 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 5, Containment Systems. (210 page(s), 5/20/2020)
- ML20160A065 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (163 page(s), 5/20/2020)
- ML20160A066 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (184 page(s), 5/20/2020)
- ML20160A067 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems. (59 page(s), 5/20/2020)
- ML20160A068 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency System. (201 page(s), 5/20/2020)
- ML20160A069 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (45 page(s), 5/20/2020)
- ML20160A070 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (233 page(s), 5/20/2020)
- ML20160A071 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations (10 page(s), 5/20/2020)
- ML20160A072 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation. (62 page(s), 5/20/2020)
- ML20160A073 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis. (528 page(s), 5/20/2020)
- ML20160A074 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications and Bases. (3 page(s), 5/20/2020)
- ML20160A075 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Chapter 16, Managing the Effects of Component Aging (58 page(s), 5/20/2020)
- ML20160A076 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Appendix A, Quality Assurance (93 page(s), 5/20/2020)
- ML20160A077 - Beaver Valley Power Station, Unit 1, Revision 32 to Updated Final Safety Analysis Report, Appendix B, Seismic Design (159 page(s), 5/20/2020)
- ML20160A078 - Beaver Valley Power Station, Unit 1, Licensing Requirements Manual (LRM) Quick Index (262 page(s), 5/20/2020)
- ML20160A079 - Beaver Valley Power Station, Unit 1, Technical Specification Bases Update Status, Revision 37 (Part 1 of 2). (349 page(s), 5/20/2020)
- ML20160A080 - Beaver Valley Power Station, Unit 1, Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2). (348 page(s), 5/20/2020)
- ML20364A140 - Beaver Valley Power Station, Units 1 - UFSAR Rev 32 Ch 2 public (1099 page(s), 12/29/2020)