Home > NRC Library > ADAMS Public Documents
"Rule 6 - Reactor Thermal Vessel Shock Considerations." Related procedure encl.
Accession Number: ML20155H523
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20155H625 - "Rule 6 - Reactor Thermal Vessel Shock Considerations." Related procedure encl. (13 page(s), 4/12/1985)
- ML20155H720 - Transcript of G Simmons 851229 exam in Herald,CA.Pp 1-82. (83 page(s), 12/29/1985)
- ML20155H706 - Troubleshooting action plan for Action List Item 11b, "Sys Response,Auxiliary Feedwater FWS-063 & FWS-064." (4 page(s), 1/4/1986)
- ML20155H810 - Transcript of 860103 meeting in Herald,CA re general troubleshooting guidelines.Pp 1-76. (77 page(s), 1/3/1986)
- ML20155H859 - Transcript of 860104 morning status rept meeting in Herald, CA.Pp 1-22. (23 page(s), 1/4/1986)
- ML20155H686 - Troubleshooting action plan for Action List Item 3A, "Integrated Control Sys Equipment Investigation." (4 page(s), 1/2/1986)
- ML20155H636 - Procedure C.37, "Atmospheric Dump Valve (ADV) Manual Loading Station Operation." Related info encl. (48 page(s), 8/12/1985)
- ML20155H645 - Rev 3 to Procedure C.13A, "Hot Shutdown From Shutdown Panel W/Fire in Control Room." (43 page(s), 11/15/1985)
- ML20155H665 - Rev 8 to Procedure AP.28, "Post-Trip Transient Rept." Related info encl. (27 page(s), 5/15/1985)
- ML20155H654 - Rev 2 to C.13B, "Cooldown From Hot Shutdown to Cold Shutdown W/Fire in Control Room." Related info encl. (59 page(s), 9/12/1985)
- ML20155H894 - Transcript of 860106 discussions w/B Daniels & B Dieterich in Herald,CA.Pp 1-79.Supporting documentation encl. (84 page(s), 1/6/1986)
- ML20155H585 - Rev 5 tp Procedure E.05, "Excessive Heat Transfer." (36 page(s), 10/26/1985)
- ML20155H627 - Rev 36 to Procedure B.4, "Plant Shutdown & Cooldown." (22 page(s), 12/18/1985)
- ML20155H826 - Transcript of 860103 morning status rept meeting in Herald, CA.Pp 1-54. (55 page(s), 1/3/1986)
- ML20155H562 - Rev 1 to Procedure E.02, "Vital Sys Status Verification." (10 page(s), 7/12/1985)
- ML20155H518 - Forwards Rev 2 to sequence of events re 851226 reactor trip. Related info encl. (31 page(s), 1/4/1986)
- ML20155H726 - Transcript of M Peterson & D Jenks 851230 exam in Herald,CA. Pp 1-47. (49 page(s), 12/30/1985)
- ML20155H865 - Transcript of 860105 meeting in Herald,CA re draft troubleshooting plan.Pp 1-59. (60 page(s), 1/5/1986)
- ML20155H798 - Transcript of D Whitney 851231 exam in Herald,CA.Pp 1-52. (54 page(s), 12/31/1985)
- ML20155H596 - "Rule 2 - HPI Flow Control." (3 page(s), 6/6/1985)
- ML20155H807 - Transcript of 860102 morning status rept meeting in Hearld,CA.Pp 1-46. (48 page(s), 1/2/1986)
- ML20155H774 - Transcript of DD Whitney & G Coward exam in Herald,CA.Pp 1-116.Supporting documentation encl. (128 page(s), 12/31/1985)
- ML20155H742 - Transcript of DD Whitney 851230 exam in Herald,CA.Pp 1-39. (41 page(s), 12/30/1985)
- ML20155H841 - Transcript of Brock 860104 interview in Herald,CA.Pp 1-42. (43 page(s), 1/4/1986)
- ML20155H911 - Transcript of J Jones 860106 interview in Herald,CA.Pp 1-12. (14 page(s), 1/6/1986)
- ML20155H879 - Transcript of 860105 meeting in Herald,CA re status report update.Pp 1-24. (27 page(s), 1/5/1986)