Forwards Comanche Peak Response Team result repts,including Rev 1 to "ISAP:I.a.4,Agreement Between Drawings & Field Terminations," Rev 1 to "ISAP:I.b.3,Conduit to Cable Tray Separation" & Rev 1 to "ISAP:VII.b.2,Valve Disassembly."
Accession Number: ML20155B118
Date Released: Wednesday, June 17, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20155B113 - Forwards Comanche Peak Response Team result repts,including Rev 1 to "ISAP:I.a.4,Agreement Between Drawings & Field Terminations," Rev 1 to "ISAP:I.b.3,Conduit to Cable Tray Separation" & Rev 1 to "ISAP:VII.b.2,Valve Disassembly." (2 page(s), 4/4/1986)
- ML20155B120 - Rev 1 to "ISAP:I.a.4,Agreement Between Drawings & Field Terminations,Comanche Peak Response Team Results Rept." (16 page(s), 3/13/1986)
- ML20155B122 - Rev 1 to "ISAP:I.b.3,Conduit to Cable Tray Separation, Comanche Peak Response Team Results Rept." (14 page(s), 3/26/1986)
- ML20155B137 - Rev 1 to "ISAP:II.b,Concrete Compression Strength,Comanche Peak Response Team Results Rept." (32 page(s), 2/28/1986)
- ML20155B154 - Rev 1 to "ISAP:III.d,Preoperational Testing,Comanche Peak Response Team Results Rept." (24 page(s), 3/13/1986)
- ML20155B159 - Rev 1 to "ISAP:VII.b.2,Valve Disassembly,Comanche Peak Response Team Results Rept." (21 page(s), 3/20/1986)