NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Simulation Facility Plan for Big Rock Point to Meet 10CFR55.45(b)," assessing simulation needs for training & testing of plant operators.

Accession Number: ML20154L732

Date Released: Monday, October 28, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer