NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 98-012-01 re TS 3.0,3 entry due to inoperability of both trains of CR ventilation.Caused by improper sys isolation.Only commitments identified in rept, listed under planned corrective actions section.

Accession Number: ML20153D081

Date Released: Monday, June 15, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer