NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards MOR for Aug 1998 for JA FitzPatrick Nuclear Power Plant.Util requests NRC to correct records re typo made in operating status rept for Jul 1998.Net average daily power level for 980703 was 801 MWe.

Accession Number: ML20151X683

Date Released: Saturday, June 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer