Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents.Forwards App N documents re CRGR meetings.App N documents available in PDR.App O documents withheld in entirety (ref FOIA Exemption 5).
Accession Number: ML20151C834
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20151C832 - Partial response to FOIA request for documents.Forwards App N documents re CRGR meetings.App N documents available in PDR.App O documents withheld in entirety (ref FOIA Exemption 5). (4 page(s), 4/5/1988)
- ML20154L836 - Comments on publication of NUREG-0801, "Evaluation Criteria for DCRDR," per encl recipient 840425 memo.Meeting should be held to discuss NUREG & relationship to industry Nuclear Util Task Action Committee documents. (1 page(s), 5/7/1984)
- ML20154L830 - Requests addl info to continue CRGR review of NUREG-0313, Rev 2 re BWR pipe cracking & long-term resolution.Regulatory analysis of proposed resolution/implementation should be available for review by committee.W Dircks 840712 memo encl. (1 page(s), 3/5/1986)
- ML20151C868 - Testimony of LW Zech to House of Representatives, Subcommittee on General Oversight & Investigations,Committee on Interior & Insular Affairs re backfit. (11 page(s), 10/9/1987)
- ML20195F797 - Summary of CRGR Meeting 91 on 860723 re proposed revs to 10CFR50.46 (ECCS rule),App K & related draft reg guide. Attendees list & supporting documentation encl. (90 page(s), 9/9/1986)
- ML20151S856 - Lists concerns on GDC 4 package for distribution to CRGR members during CRGR Meeting 84.DBA containment temp & pressure as function of break size should be reviewed. J Scinto comments to J Sniezek encl. (54 page(s), 1/27/1986)
- ML20151C904 - Forwards summary & issue identification for CRGR Meeting 98 on 861016 re proposed deferred plant policy. (4 page(s), 10/1/1986)
- ML20151K338 - Advises that proposed NUREG-0801, "Evaluation Criteria for Detailed Control Room Design Reviews," should be issued as app to Chapter 18 to SRP,in continuing w/policy of not using NUREG repts to promulgate regulatory guidance. (1 page(s), 7/12/1984)
- ML20151J001 - Advises that NUREG-0801, "Evaluation Criteria for Detailed Control Room Design Reviews," will be issued in final form, incorporating public comments & consistent w/requirement of NUREG-0737,Suppl 1. (2 page(s), 4/25/1984)
- ML20151C882 - Forwards summary & issue identification for CRGR Meeting 84 on 860122 re proposed broad-scope rule to modify GDC 4 of 10CFR50. (6 page(s), 1/17/1986)
- ML20151C859 - Forwards proposed draft testimony on backfit to be given by chairman at 871014 hearing of House Subcommittee on General Oversight & Investigation,Committee on Interior & Insular Affairs. (1 page(s), 10/5/1987)
- ML20195F813 - Forwards summary re proposed generic ltr to BWR licensees transmitting technical findings related to MSIV leakage & MSIV leakage control sys.Review re resolution of Generic Issue C-8 scheduled for CRGR Meeting 96 on 860917. (16 page(s), 9/12/1986)