NRC Logo

Home > NRC Library > ADAMS Public Documents

Responds to IE Bulletin 80-13 re exam of core spray sys spargers.Crack indication identified on north core spray line outside shroud.Crack result of IGSCC.Unit 2 can safely operate w/crack during next fuel cycle.No changes required.

Accession Number: ML20151B599

Date Released: Saturday, June 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer