NRC Logo

Home > NRC Library > ADAMS Public Documents

Informs that plant will be ready for Unit 1 App R insp beginning wk of 880705,per S Black 880606 request.List of mods identified during verification of Rev 9 to App R shutdown logic & Engineering Calculation SQN-CSS-024 encl.

Accession Number: ML20151A243

Date Released: Saturday, June 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer