Home > NRC Library > ADAMS Public Documents
Forwards facility procedures governing 10CFR50.59 reviews.
Accession Number: ML20151A165
Date Released: Saturday, June 13, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20151A162 - Forwards facility procedures governing 10CFR50.59 reviews. (2 page(s), 7/15/1988)
- ML20151A335 - Temporary Change Notice 1-2 to Rev 1 to Operations Div Procedure SO123-0-14, "Notification & Reporting of Significant Events." (45 page(s), 6/16/1988)
- ML20151A360 - Temporary Change Notice 11-3 to Rev 11 to Administrative Procedure S0123-VI-1.0, "Documents - Review & Approval Process for Site Orders,Procedures & Instructions." (42 page(s), 9/14/1987)
- ML20151D441 - Temporary Change Notice 11-4 to Administrative Procedure SO123-VI-1.0, "Documents - Review & Approval Process for Site Orders,Procedures & Instructions." (4 page(s), 6/30/1988)
- ML20151A364 - Rev 3 to Administrative Procedure SO123-VI-1.0.1, "Documents - Temporary Change Notices (TCNs) Preparation, Review,Approval,Incorporation & Distribution." (30 page(s), 1/28/1988)
- ML20151A388 - Temporary Change Notice 3-1 to Rev 3 to Procedure SO123-VI-1.0.1, "Documents - Temporary Change Notices (TCNs) - Preparation,Review,Approval,Incorporation & Distribution." (4 page(s), 6/30/1988)
- ML20151A390 - Temporary Change Notice 1-1 to Rev 1 to Procedure SO123-VI-1.3, "Documents - Guidelines for Completing Unreviewed Question & Environ Evaluation." (14 page(s), 12/18/1985)
- ML20151D513 - Temporary Change Notice 1-2 to Administrative Procedure SO123-VI-1.3, "Documents - Guidelines for Completing Unreviewed Safety Question & Environ Evaluation." (1 page(s), 5/15/1987)
- ML20151A404 - Temporary Change Notice 6-6 to Engineering Procedure SO123-V-4.14, "Proposed Facility Change (PFC)." (14 page(s), 3/29/1988)
- ML20151A414 - Temporary Change Notice 2-1 to Rev 2 to General Procedure SO123-XV-5, "Nonconforming Matl,Parts or Components." (40 page(s), 5/19/1988)
- ML20151A417 - Rev 6 to Dept QA Procedure E&C 24-10-15, "Preparation,Review & Approval of Proposed Facility Changes (PFC) & PFC Packages (PFCP) for San Onofre Nuclear Generating Station 1,2 & 3." Proposed Change Notices 1,2 & 3 encl. (49 page(s), 2/1/1988)
- ML20151A427 - Rev 4 to Dept QA Procedure E&C 24-10-16, "Development, Review,Approval & Release of SCE Design Change Package (DCP) & Assembly W/Proposed Facility Changes (PFC) San Onofre...1, 2 & 3." Proposed Change Notice 1 encl. (23 page(s), 2/1/1988)
- ML20151A436 - Rev 3 to Dept QA Procedure E&C 24-10-17, "Interim Design Change Notice (IDCN)/Design Change Notice (DCN) for San Onofre Nuclear Generating Station 1,2 & 3." Proposed Change Notices 1,2,3 & 4 encl. (12 page(s), 2/4/1987)
- ML20151A439 - Rev 0 to Dept QA Procedure E&C 24-10-19, "Development, Review,Approval & Release of SCE Limited Change Packages (LCPs) San Onofre Nuclear Generating Station 1,2 & 3." Proposed Change Notice 1 encl. (52 page(s), 2/1/1988)
- ML20151A651 - Rev 2 to Dept QA Procedure E&C 24-10-21, "Preparation, Review,Approval & Release of Field Change Notices for Issue to Const/Startup/Maint W/o SCE Design Change Package San Onofre...1,2 & 3." Proposed Change Notices 1,2 & 3 encl. (9 page(s), 2/4/1987)
- ML20151A661 - Rev 4 to Dept QA Procedure E&C 40-9-21, "Nuclear Safety Group Review,Evaluation & Audit Responsibilities for San Onofre Nuclear Generating Station." Proposed Change Notices 1 & 2 encl. (18 page(s), 4/18/1986)