Home > NRC Library > ADAMS Public Documents
Forwards info prepared to assist in closing out open items resulting from Insp Rept 50-267/87-12 & info re corrective actions discussed in LER 85-029.Cold checkout tests, functional tests & specific surveillance tests encl.
Accession Number: ML20150E272
Date Released: Friday, June 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20150E270 - Forwards info prepared to assist in closing out open items resulting from Insp Rept 50-267/87-12 & info re corrective actions discussed in LER 85-029.Cold checkout tests, functional tests & specific surveillance tests encl. (2 page(s), 3/18/1988)
- ML20150E274 - Issue 3 to Procedure TASMAP-7, "Work Review Committee Guidelines." (262 page(s), 1/10/1986)
- ML20150E290 - Issue 5 to Procedure SR 5.3.4b1-A "Loop I Shutdown Cooling Power Operated Valve Test." (114 page(s), 12/31/1987)
- ML20150E299 - Issue 5 to Procedure SR 5.3.4b2-A, "Loop II Safe Shutdown Cooling Power Operated Valve Tests." (108 page(s), 3/5/1986)
- ML20150E304 - Issue 1 to Procedure SR 5.4.1.3.8.abcd-R2, "Steam Line Rupture Detection/Isolation Sys (SLRDIS) Calibr & Testing for Panel I-93544." (287 page(s), 3/20/1987)
- ML20150E314 - Issue 1 to Procedure SR 5.4.1.3.8.abcd-R1, "Steam Line Rupture Detection/Isolation Sys (SLRDIS) Calibr & Testing for Panel I-93543." (273 page(s), 3/18/1988)