NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Summary Rept & Cover Plan,Geotechnical Test Cover Const at Anaconda Bluewater Tailings Facility," responding to remaining NRC technical comments on slimes stabilization, per schedule ref in 870528 & 1110 submittals.

Accession Number: ML20150D774

Date Released: Monday, October 28, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer