WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report.
Accession Number: ML20150A337
Date Released: Monday, June 29, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20150A338 - WSC Consolidated Interim Storage Facility Submission of Revision 3 to Safety Analysis Report. (6 page(s), 5/22/2020)
- ML20150A339 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Affidavits for Interim Storage Partners, TN Americas, NAC International. (6 page(s), 5/22/2020)
- ML20150A340 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 1, Introduction and General Description of Installation. (89 page(s), 5/22/2020)
- ML20150A341 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Site Characteristics. (Part 1 of 2) (88 page(s), 5/22/2020)
- ML20150A342 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Site Characteristics. (Part 2 of 2) (31 page(s), 5/22/2020)
- ML20150A343 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment A, Meteorological Data from Waste Control Specialists on-Site Weather Stations. (3841 page(s), 5/22/2020)
- ML20150A344 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report. (Part 1 of 5) (117 page(s), 5/22/2020)
- ML20150A345 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report. (Part 2 of 5) (92 page(s), 5/22/2020)
- ML20150A346 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report. (Part 3 of 5) (239 page(s), 5/22/2020)
- ML20150A347 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report. (Part 4 of 5) (412 page(s), 5/22/2020)
- ML20150A348 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report. (Part 5 of 5) (194 page(s), 5/22/2020)
- ML20150A349 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs. (17 page(s), 5/22/2020)
- ML20150A350 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF. (1 page(s), 5/22/2020)
- ML20150A351 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF. (348 page(s), 5/22/2020)
- ML20150A352 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists (Part 1 of 3). (70 page(s), 5/22/2020)
- ML20150A353 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site (Part 2 of 3). (63 page(s), 5/22/2020)
- ML20150A354 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density (Part 3 of 3). (26 page(s), 5/22/2020)
- ML20150A355 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2 Attachment G, Technical Specifications for Towers. (121 page(s), 5/22/2020)
- ML20150A356 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data. (81 page(s), 5/22/2020)
- ML20150A357 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Chapter 3, Principal Design Criteria. (558 page(s), 5/22/2020)
- ML20150A358 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix A.1, Introduction and General Description of Installation NUHOMS - MP187 Cask Sytem. (177 page(s), 5/22/2020)
- ML20150A359 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix B.1, Introduction and General Description of Installation Standardized Advance NUHOMS System. (145 page(s), 5/22/2020)
- ML20150A360 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix C.1, Introduction and General Description of Installation Standardized NUHOMS - 61BT System. (245 page(s), 5/22/2020)
- ML20150A361 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix D.1, Introduction and General Description of Installation Standardized NUHOMS- 61BTH Type 1 System. (137 page(s), 5/22/2020)
- ML20150A362 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix E.1, Introduction and General Description of Installation NAC-MPC. (167 page(s), 5/22/2020)
- ML20150A363 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix F.1, Introduction and General Description of Installation NAC-UMS. (108 page(s), 5/22/2020)
- ML20150A364 - WSC Consolidated Interim Storage Facility Revision 3 to Safety Analysis Report, Appendix G.1, Introduction and General Description of Installation NAC-Magnastor. (112 page(s), 5/22/2020)