NRC Logo

Home > NRC Library > ADAMS Public Documents

Submits addl info re bottom mounted instrumentation thimble vibration,per NRC request.Acceptance criteria for eddy current measurement scheduled to be performed after 12 wks of operation.Crimping procedure encl.

Accession Number: ML20149D318

Date Released: Thursday, June 11, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer