Home > NRC Library > ADAMS Public Documents
Ack receipt of 780818,0919 & 1020 ltrs informing NRC of steps taken to correct deviations noted in QA Program Inspec Rept#99900086/78-01.
Accession Number: ML20148S181
Date Released: Monday, October 28, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20148S176 - Ack receipt of 780818,0919 & 1020 ltrs informing NRC of steps taken to correct deviations noted in QA Program Inspec Rept#99900086/78-01. (1 page(s), 11/7/1978)
- ML20148S224 - Responds to 781010 NRC request for addl info re corrective measures taken on the basis of findings in QA Program Insp Rept 99900086/78-01.Forwards documentation of training sessions re heat treatment,calibr & welding qual. (4 page(s), 10/20/1978)
- ML20148S234 - Ack receipt of 780818 & 0919 ltrs informing NRC of steps taken to correct deviations noted in QA Program Insp 99900086/78-01.Requests addl info on training w/in 20 days. (1 page(s), 10/10/1978)
- ML20148S244 - Responds to 780908 NRC ltr re deviation noted in QA Program Insp Rept#99900086/78-01.Corrective actions:personnel trained in ASME IX,heat treatment & calibr principles. (1 page(s), 9/19/1978)
- ML20148S255 - Ack receipt of 780818 ltr informing NRC of steps taken to correct deviations noted in QA Program Insp Rept 99900086/78-01.Requests description of actions taken to prevent recurrence. (1 page(s), 9/8/1978)
- ML20148S262 - Responds to 780721 NRC ltr re deviation noted in QA Program Insp Rept 99900086/78-01.Corrective actions:heat treatment procedures being rev,test requirements rev,audits resched,QA rev & equip calibr. (2 page(s), 8/18/1978)
- ML20148S269 - Forwards QA Program Insp Rept 99900086/78-01 on 780619-22 & notice of deviation. (2 page(s), 7/21/1978)
- ML20148S337 - Notice of Deviation from inspec on 780619-22. (5 page(s), 7/21/1978)
- ML20148S385 - QA Program Insp Rept 99900086/78-01 on 780619-22 during which 5 items of noncompliance were noted in the following areas:control of welding & postweld heat treatment,internal audit,vendor audits,equip calibr,nonconformances & correctio (17 page(s), 7/21/1978)