NRC Logo

Home > NRC Library > ADAMS Public Documents

Approves proposed Change 32 to Tech Specs,authorizing installation of vent line which would provide continuous controlled flow of gas from vapor phase portion of reactor pressurizer to low pressure surge tank.

Accession Number: ML20148H841

Date Released: Monday, October 28, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer