Home > NRC Library > ADAMS Public Documents
Responds to 851126 request for trip repts involving Civil/ Structural Group.Listed repts encl.
Accession Number: ML20141K361
Date Released: Wednesday, June 3, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20141K357 - Responds to 851126 request for trip repts involving Civil/ Structural Group.Listed repts encl. (1 page(s), 12/18/1985)
- ML20141K373 - Trip rept of 851126 audit discussions per slenderness ratio limitations for hanger type supports.Ebasco Svcs,Inc considering adoption of revised procedure.Slenderness ratios should be used only where uncertainties exist. (3 page(s), 12/5/1985)
- ML20141K376 - Trip rept of 851011 audit w/util,TERA & Comanche Peak Response Team.List of attendees encl.Meeting between TERA & BNL consultants will be held to discuss steam generator lateral restraints. (6 page(s), 12/2/1985)
- ML20141K381 - Summary of 851025 meeting w/util & Ebasco Svc,Inc re design verification testing & mods to conduit supports & cable tray supports.List of attendees encl.Ebasco & util will provide listed documents for review. (6 page(s), 12/2/1985)
- ML20141K383 - Summary of 851108 meeting w/util & EBASCO Svcs,Inc re procedures for verification program of cable tray hangers. Ebasco Svcs,Inc will provide Comanche Peak Response Team w/listed info. (4 page(s), 12/2/1985)
- ML20141K394 - Trip rept of 851113-14 visit to Corporate Consulting & Development Co,Ltd to audit ongoing tests of electrical conduit clamps. (4 page(s), 12/2/1985)
- ML20141K403 - Trip rept of 851118-22 audit of cable tray hanger walkdown. Supports walked down & noted discrepancies listed. (5 page(s), 12/2/1985)