Home > NRC Library > ADAMS Public Documents
Forwards response to 970726 telcon RAI re request for deviation from App R,Section III.O requirement to have oil collection sys for Reactor Coolant Pump remote lube oil fill lines.
Accession Number: ML20141H507
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20141H502 - Forwards response to 970726 telcon RAI re request for deviation from App R,Section III.O requirement to have oil collection sys for Reactor Coolant Pump remote lube oil fill lines. (6 page(s), 7/25/1997)
- ML20266A061 - REACTOR COOLANT PUMP REMOTE OIL FILL MODIFICATION. (1 page(s), 10/25/1994)
- ML20266A067 - FIRE DETECTION SYSTEM RACEWAYS & EQUIPMENT LAYOUT REACTOR BUILDING +21.00 FEET. (1 page(s), 5/30/1996)
- ML20266A071 - FIRE DECTECTION SYSTEM RACEWAYS & EQUIPMENT LAYOUT REACTOR BUILDING ELEVATION +46.00 FEET. (1 page(s), 5/30/1996)
- ML20266A076 - REACTOR COOLANT PUMP SPRINKLER SYSTEM FP-M1 & FP-M2. (1 page(s), 6/25/1993)
- ML20266A082 - SPRINKLER SYSTEMS FPM 1 REACTOR COOLANT PUMP 1 A.Sheet 1 of 4. (1 page(s), 10/26/1992)
- ML20266A084 - SPRINKLER SYSTEM FP M1 REACTOR COOLANT PUMP 1B.Sheet 2 of 4. (1 page(s), 4/6/1990)
- ML20266A090 - SPRINKLER SYSTEM FP M2 REACTOR COOLANT PUMP 2A.Sheet 3 of 4. (1 page(s), 4/6/1990)
- ML20266A094 - SPRINKLER SYSTEM FP M2 REACTOR COOLANT PUMP 2B.Sheet 4 of 4. (1 page(s), 10/25/1994)