NRC Logo

Home > NRC Library > ADAMS Public Documents

LER 86-007-01:on 860107,two bolting studs in valve flange MOV-SI-1890B failed.Caused by intergranular stress corrosion of bolting matl.Insp conducted & stud matl replaced,as necessary.W/860331 ltr.

Accession Number: ML20141D059

Date Released: Wednesday, June 3, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer