NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards LER 97-026-00 re failure to establish operability of RCS average temp instrumentation input to MSL isolation function during plant conditions required by TS Table 15.3.5-4 item 2.b operability requirements.

Accession Number: ML20141C260

Date Released: Wednesday, June 3, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer